A development’s traffic effects can extend beyond its driveway to nearby intersections and road access. An intersection traffic impact assessment examines the trips a proposal is expected to generate, how those trips may affect the surrounding network, and whether access or capacity changes need to be considered. Across Australia, an assessment may be triggered when a development exceeds a state-specific threshold of 10-100 peak-hour trips.
It’s understandable to want a clear answer about whether your project needs a Traffic Impact Assessment (TIA). The requirement depends on the proposal, its likely traffic generation, its location and the rules in the relevant state or territory. Referral requirements may also apply if site access or proposed works affect a road authority’s interests.
This article explains what a TIA covers, when an assessment or referral may be required, and how intersection capacity is assessed. It also explains how access needs and potential mitigation measures fit into the process, helping you identify the traffic issues to address as your development takes shape.
Key Takeaways
- Understand how a TIA estimates, distributes and assigns development traffic to nearby roads and intersections.
- Identify the location, access and development triggers that can lead to a road-authority referral.
- Learn how delay, level of service and queue length help assess intersection capacity and guide mitigation.
- Distinguish between traffic report types and understand how project scale and scope shape the assessment.
- See how traffic reporting, parking design and vehicle movement assessments can support development planning.
What is a Traffic Impact Assessment (TIA)?
A Traffic Impact Assessment (TIA) estimates how a development may affect nearby roads and intersections. Its steps are to estimate traffic generation, distribute trips between destinations, assign trips to routes, and assess their effect on the network.
-
Estimate Traffic Generation
Identify the proposed land use and estimate the vehicle trips it is likely to generate. Separate trips by purpose and time period, because a residential proposal and a retail site can produce different travel patterns. The Institute of Transportation Engineers’ (ITE) Trip Generation Manual is used for trip estimates, with locally derived trip rates or equations used where applicable.
For a NSW development, use the applicable local guidance and land-use data to inform the estimate. The Transport for NSW (TfNSW) Guide to Traffic Impact Assessment 2024 may be used to determine trip generation. The RTA Guide to Traffic Generating Developments also has a 2013 survey supplement that may be used for NSW developments.
-
Distribute Generated Trips
Map the likely destinations for generated trips, considering the proposal’s location, land use and nearby destinations. For example, trips from a residential site may head towards employment areas, shops or schools. Consider the road connections between the site and those destinations rather than assuming every trip follows the same route.
Next, estimate how trips divide between available destinations and access points. Trip distribution describes origin-and-destination patterns, but does not determine the exact roads each driver will use. Keep assumptions consistent with the site layout and surrounding network, including major roads and local streets.
- Assign trips to routes. Apply the distribution pattern to the road network to identify likely routes between the development and its destinations. Trace practical connections from each site access point and account for alternative routes where available. This step helps identify which intersections may receive additional turning movements.
For an intersection traffic impact assessment, distinguish through movements from turns into and out of the site. A trip entering from a local street may affect a different intersection movement from one approaching on a major road. Use consistent route assumptions when describing each affected intersection.
- Assess the network effects. Combine assigned development trips with existing traffic to identify where the proposal could change intersection operations. Consider affected approach legs and turning movements, not just the total number of trips entering the wider road network.
Record the generation, distribution and assignment assumptions clearly. In NSW, the 2024 TfNSW guide may inform the traffic impact assessment process. The resulting movement forecasts provide the basis for later capacity analysis, including review of delay, level of service and queue length.
Intersection and road-access referral requirements
Applicable requirements depend on the state or territory, road classification, proposed works and development type. In NSW, key references include the State Environmental Planning Policy (Transport and Infrastructure) 2021 and Roads Act 1993; other jurisdictions apply their own referral rules and assessment guidance.
- Identify the road authority and classify each affected road. In NSW, consent under Section 138 of the Roads Act 1993 is needed when access is taken from a classified road or works extend into the road reserve. These triggers are separate from development referrals. A new driveway connecting to a classified road may therefore raise an access-consent issue, even when the proposal is also assessed through a planning pathway.
- For a NSW proposal, assess whether Schedule 3 thresholds under section 2.122 of the SEPP (Transport and Infrastructure) 2021 require referral to Transport for NSW. Stricter Schedule 3 thresholds apply to development within 90 metres of a classified road. Record the proposal’s location and relevant development characteristics, then compare them with the applicable threshold. Referral is a planning step, not a substitute for considering road access or intersection effects.
- Check the state-specific access trigger before finalising the assessment scope. In Queensland, reconfiguring a lot within 25 metres of a state-controlled road or its intersection is a referral trigger. The distance and road status matter, so map the site against the relevant road and intersection. A nearby intersection can bring a proposal into the referral process even when the new access is not directly on the main road.
- Apply Tasmania’s Road and Railway Assets Code thresholds to the expected increase in traffic. On major roads, the threshold is an increase of 10% or 10 vehicles per day, whichever is greater. On roads other than major roads, it is 20% or 40 vehicles per day. Establish the relevant road category and compare the predicted increase with its threshold. Keep the calculation tied to the road being assessed.
- Allow for the relevant referral pathway and assessment guidance in other jurisdictions. Victoria’s Department of Transport and Planning referral responses are statutorily due within 28 days. In the ACT, the Transport Impact Assessment Guidelines 2025 took effect on 1 July 2025 and entered a 12-month trial period. These jurisdictional details affect referral timing and assessment framing, so identify the applicable planning area before setting out the approval pathway.
- Document each referral trigger separately from the traffic analysis. List the road authority, relevant road classification, access location, proposed road-reserve works and applicable planning provision. For example, a NSW proposal near a classified road may need both a Schedule 3 referral assessment and consideration of Section 138 consent. This distinction helps show which approval relates to development referral and which concerns access or works.
Intersection capacity and mitigation measures
Assess capacity by comparing expected traffic with intersection performance. Traffic modelling typically evaluates delay, level of service and queue length.
Also consider effects on pedestrians, cyclists and public transport, alongside road safety. Historical crash data can help identify crash patterns, contributing factors and high-risk locations.
-
Assess Intersection Capacity
Model the intersection with existing traffic and the development’s forecast movements. Review delay, level of service and queue length for each approach and turning movement. These measures indicate where traffic may experience more delay or queuing, and whether particular movements are more constrained than others.
Compare modelled conditions with and without the proposal. Check whether queues could affect nearby intersections, driveways or access points. For example, a queue extending into an adjoining intersection could affect more than the junction being assessed. Record assumptions and model outputs so capacity findings can be traced to specific movements.
-
Assess Impacts on Road Users
Review how intersection movements interact with people walking, cycling and using public transport. Check pedestrian crossing routes, cyclist movements and locations where vehicles turn across those paths. Consider bus movements and stops where relevant to the surrounding network. Describe how additional turning traffic or queues could affect each road-user group.
Use historical crash data to identify patterns, contributing factors and high-risk locations. Examine recorded crash types and locations alongside the proposed access and intersection movements. For example, a recurring crash pattern near a turning movement warrants attention in the assessment. Keep road-safety findings distinct from capacity results, because acceptable queues alone do not capture every road-user impact.
-
Identify Mitigation Measures
Link each proposed mitigation measure to a specific modelled impact or road-user issue. If queues affect a turning movement, assess whether a change to the intersection layout or traffic control could address it. If access movements conflict with pedestrian or cyclist paths, consider design changes that could reduce or better manage those conflicts.
Compare forecast conditions before and after each measure, using delay, level of service and queue length where applicable. Check that a measure does not shift queues or conflicts to another approach, nearby intersection or crossing. Explain the issue, the design response and its effect on network operation. This makes each mitigation measure traceable to the assessment findings.
Traffic report types and assessment scope
The report type and scope depend on expected traffic generation, development details and jurisdiction. To determine the data and surveys needed, define the assessment area, gather traffic information for affected roads and intersections, and choose a report suited to the proposal.
-
Define the Report Type and Scope
Start by matching the proposed land use and expected peak-hour trips to the relevant state framework. In Western Australia, the WAPC system indicates no assessment for developments generating under 10 peak-hour trips, a Transport Impact Statement for 10-100 trips, and a full TIA for over 100 trips.
Use these factors to frame the initial report scope, then identify intersections and access points the development could affect. Even a smaller report needs to address relevant traffic issues. Do not treat Western Australia’s thresholds as national rules. Assessment requirements and report names vary between jurisdictions, so identify the applicable planning area first.
-
Identify Required Traffic Data
List the traffic inputs needed to assess the affected network. These may include existing traffic volumes, turning movements at relevant intersections, road layouts, access locations and the development’s proposed use. If available counts do not capture the movements being assessed, traffic surveys can provide the missing observations.
For example, a turning-movement count can show how vehicles use each intersection approach. Match survey coverage to the assessment question and likely peak periods. Include relevant site plans and development details so the analysis connects proposed access and land use with the road network. Avoid using counts from an unrelated location as a direct substitute.
- Set the future-condition horizon. State the period used to test how the network may operate after development traffic is added. Traffic impact assessments may use a 10-year or 20-year horizon for future-condition analysis. Select the horizon applicable to the assessment and explain the assumptions behind the forecast.
Keep the development’s forecast trips distinct from background traffic changes. This helps show which movements relate to the proposal and which reflect wider network growth. For an assessed intersection, report future movements at that location rather than relying only on a site-wide total.
- Structure the report around its scope. A typical traffic impact assessment report may follow a structure derived from Austroads Part 12 and state-specific supplements. Organise the report so its project description, traffic inputs, assumptions, analysis and conclusions can be followed in sequence.
Connect each survey and data source to the analysis it supports. For example, identify which intersection turning movements inform the capacity assessment. State data limitations clearly and explain their effect on the assessment. A defined scope makes it easier to see whether the report addresses site access, affected intersections and relevant future conditions.

When an intersection traffic impact assessment may be required
An assessment may be triggered by traffic generation, a state-specific threshold, a road-access referral or a likely effect on a critical intersection movement. Common risks include unsuitable traffic counts, overlooked route assumptions and treating forecasts as exact predictions rather than scenario-based estimates.
- Check the relevant state trigger. Thresholds vary across Australia, so identify the planning jurisdiction before deciding the report scope. Western Australia’s WAPC system indicates no assessment for developments generating under 10 peak-hour trips, a Transport Impact Statement for 10-100 trips, and a full TIA for over 100 trips. These categories show why a single national trip threshold cannot be applied to every proposal.
- Compare development traffic with the applicable threshold. In the ACT, the indicative threshold for a transport impact assessment is 10 peak-period vehicle trips. Queensland’s TMR “5% rule” indicates an assessment is required when a development adds more than 5% to any critical movement on a state-controlled road. Focus on the relevant movement, not only the site’s total daily traffic.
- Consider location and road authority interests. A proposal can require assessment because of where it sits, even if its trip generation appears modest. In NSW, Schedule 3 referral thresholds under the SEPP (Transport and Infrastructure) 2021 are stricter for development within 90 metres of a classified road. The location trigger and the proposal’s characteristics both inform the referral decision.
- Test whether the intersection is materially affected. Trace likely development traffic to its access points and affected intersections. A modest site-wide increase may concentrate on one turning movement during a peak period. Trips spread across several routes may have a different effect. Review critical movements and network context rather than relying on an aggregate figure alone.
- Make assumptions explicit. Traffic counts represent observed conditions, while trip rates and forecasts estimate future demand. Problems can arise when counts do not reflect the period or movements being assessed, or when route assignment does not match the available road network. State how each input informs the analysis and distinguish observed data from forecast assumptions.
- Account for limitations in the conclusion. Forecasts depend on development details, background traffic assumptions and the selected future scenario. If the proposal’s land use or access arrangement changes, its trip profile and intersection effects may change too. Set out which inputs drive the result and avoid presenting a model output as a guarantee of future operating conditions.
- Set the assessment scope around the trigger. A trip threshold may indicate the report type, while a road location or critical movement may determine which intersections need analysis. ML Traffic Engineers prepares Traffic Impact Assessments and Statements, with the assessment scoped to the development and its access impacts.
ML Traffic Engineers Australia: Car Park Design
ML Traffic Engineers Australia provides Car Park Design when a development’s parking layout needs to work alongside its access and traffic arrangements. Car park geometry can affect vehicle circulation, driveway movements and the traffic reaching nearby intersections, so it should align with the site’s broader assessment.
For parking layouts, ML Traffic Engineers provides design input and certification against AS 2890.1 and AS 2890.2. A Vehicle Swept Path Analysis can assess whether design vehicles can manoeuvre through the proposed layout. A Traffic Impact Assessment (TIA) Report addresses development traffic and its effects on the surrounding network, while a Car Parking Demand Assessment considers parking needs.
Contact ML Traffic Engineers Australia to discuss your project’s car park design or related traffic assessment needs.
Carry your traffic findings into the next design decision
Use the assessment as a working design input, not as a document separate from the plans. As the proposal develops, changes to site access, building layout or parking can alter how vehicles move through the site and reach nearby intersections. Keep traffic assumptions aligned with current plans so planning decisions and design revisions reflect the same proposal.
A well-scoped intersection traffic impact assessment also gives the project team a clear basis for discussing access and network effects during development approval. If design changes affect vehicle circulation or parking, coordinate those details with the traffic analysis before finalising the layout.
ML Traffic Engineers Australia can help align traffic and vehicle movement considerations with your development plans. Discuss your project with ML Traffic Engineers Australia and take the next step with a clear basis for design decisions.
Frequently Asked Questions
Does a TIA guarantee the DA is approved?
No. A Traffic Impact Assessment informs the development application (DA), but does not decide the planning outcome. The consent authority considers the traffic report alongside other planning matters and any agency referrals. An intersection traffic impact assessment can identify traffic effects and outline design responses, but resolving an access concern does not automatically resolve unrelated planning issues or guarantee approval.
How long does a TIA take?
Timing depends on the report scope, available plans, traffic counts and modelling needs. A NSW letter report for a small change of use takes about one week from receipt of plans. A full NSW assessment involving surveys and SIDRA typically takes three to four weeks. A standard assessment where traffic counts are already available may take 3-5 weeks to prepare. These timeframes relate to different project scopes.
Who can prepare a TIA in NSW?
There is no licence requirement in NSW for a person to prepare a Traffic Impact Assessment. The report still needs sound traffic data, transparent assumptions and analysis suited to the development. A proposal affecting a busy intersection, for example, may need turning-movement analysis and SIDRA modelling. A small change of use may need a narrower assessment, depending on its traffic effects and the relevant approval requirements.
What is an intersection traffic impact assessment in Australia?
An intersection traffic impact assessment examines how development traffic may affect an intersection and the surrounding road network. It considers expected vehicle movements, affected approaches and turning movements, then assesses operational effects such as delay and queues. For example, a new site access may add turning traffic to an existing junction. The assessment helps explain whether the intersection can accommodate those movements and whether design or operational responses should be considered.
When is an intersection traffic impact assessment required for a development in Australia?
An assessment may be required when development traffic reaches a jurisdictional threshold, a referral rule applies, or road access and intersection movements could be affected. Triggers vary by state, development type, road classification and location. A proposal near a classified or state-controlled road may need particular scrutiny. Identify the planning jurisdiction and road authority early, then establish which thresholds and referral provisions apply to the site.
How are intersection capacity, delay, and level of service measured in Australia?
Engineers assess forecast intersection movements through traffic analysis or modelling, including SIDRA where appropriate. An intersection traffic impact assessment can report delay, level of service and queue length for relevant approaches and turning movements. For example, modelling can compare existing conditions with a future scenario that includes development traffic. These operational measures do not, on their own, describe every pedestrian, cyclist or road-safety concern.
What traffic generation rates and trip distribution methods are used for development assessments?
Trip estimates use land-use information and applicable traffic-generation rates. The ITE Trip Generation Manual is used, with locally derived rates or equations applied where relevant. In NSW, the TfNSW Guide to Traffic Impact Assessment 2024 may inform trip-generation estimates. Distribution estimates where trips travel, while assignment places those trips on plausible routes. Site access and available road connections influence which intersection movements receive traffic.
What intersection upgrades or mitigation measures may be required, and who pays?
Possible responses depend on the identified impact and may include changes to the access layout, intersection geometry or traffic control. The assessment should link each measure to a specific movement or operational issue, then test its effect on delay, queues and other road users. A TIA does not itself set a payment amount. Relevant approval conditions or project agreements define delivery and funding responsibilities.
Disclaimer
The content on www.mltraffic.com.au, including all technical articles, guides, and resources, is provided for general informational and educational purposes only. It is not intended to constitute professional advice in traffic engineering, transportation planning, development approvals, or any other technical or legal field.
While ML Traffic Engineers makes every reasonable effort to ensure the accuracy, completeness, and timeliness of the information published, we do not provide any warranties or representations (express or implied) regarding its reliability, suitability, or availability for any particular purpose. Any reliance you place on the content is strictly at your own risk.
In no event shall ML Traffic Engineers, its directors, employees, authors, or affiliates be liable for any direct, indirect, incidental, special, consequential, or punitive damages (including, without limitation, loss of profits, data, or business opportunities) arising out of or in connection with the use of, or inability to use, any information provided on this website.
The articles and guides on this site are not a substitute for engaging a qualified, registered professional traffic engineer (such as an NPER or RPEQ engineer) to assess your specific project requirements. For tailored advice, compliance assessments, or traffic engineering services, please contact a competent professional.
This disclaimer may be updated from time to time without notice. By accessing or using this website, you agree to be bound by the most current version of this disclaimer.